ALL AMERICAN BOULEVARD
Current Status & Contacts
Design Phase
Public Involvement
Roadway Conceptual Analysis Phase
 Adobe PDF
 Microsoft Word
Roadway Conceptual Analysis Phase
Study Process
horizontalbar

Orange County has developed an overall roadway improvement process. Here are the key steps:

  1. Needs
  2. Funding
  3. Roadway Conceptual Analysis
  4. Roadway Design
  5. Right-of-Way Acquisition
  6. Roadway Construction
  7. Maintenance

The Roadway Conceptual Analysis, or RCA, process is a critical step in developing the County's overall transportation system. This process confirms the need for a roadway improvement, determines the most suitable alignment for the improvement, refines the cost estimates, and estimates the total impacts on the community and environment. The completion of this process creates a roadway "footprint" for the remaining phases.

The RCA combines the best practices of engineering and transportation planning principles for roadway improvement projects. The RCA requires extensive data collection on existing roadway conditions, such as: traffic counts and accident data, cultural, archeological, historic, natural and hydraulic features, and information on threatened and endangered plant and animal species.

Once the data collection on existing conditions is completed, it is analyzed in relation to data collected on future roadway conditions. Future roadway conditions are based on traffic forecasts, future land use plans, and utility and transportation plans.
Throughout the data collection and subsequent technical analysis, there is ongoing public involvement and input from community stakeholders, such as citizens, business owners, County Commissioners, and other affected persons and organizations.

The heart of the RCA process is the melding of technical data collection and analysis with the dialogue from community stakeholders to produce acceptable and appropriate solutions to transportation problems. The RCA has been approved by the Orange County Board of County Commissioners, the project will proceed to final design, right-of-way acquisition, and construction.

Overview
horizontalbar

The Board of County Commissioners Public Hearing was held on August 5, 2003. The All American Boulevard Preliminary Engineering Report was approved by the Board of County Commissioners for Final Design, Right-of-Way Acquisition and Construction.

Purpose
horizontalbar

The purpose of this Preliminary Engineering Report Study is to confirm the need for improvements and determine the most feasible alternatives. This Preliminary Engineering Report Study evaluated the impacts on the community and the environment. This Preliminary Engineering Report Study also informed the public on the status and progress of the study through a public involvement program. It provided a forum for public input to the decision making process through public meetings, public hearings and small group meetings.