The Boggy Creek Road project is currently in the Design Phase.
The design phase of this project began in February, 2008. Field surveys are being conducted and the data collection phase is underway. Additional right-of-way will be required for the roadway construction and for stormwater ponds. In some areas, temporary construction easements or slope easements may be needed to blend the proposed improvements with the existing conditions. The design phase of the project is scheduled to be completed by July, 2009. The right-of-way acquisition and construction phases will follow.
For more detailed information regarding this project, please review the Monthly Roadway Capital Improvement Program Report |