Final design activities are underway to prepare construction plans, specifications and right-of-way maps for the proposed Valencia College Lane improvements from Goldenroad Road to Econlockhatchee Trail. The plans will address roadway, drainage, signals and traffic signing and pavement markings. The final design will also include plans for maintaining traffic flow and providing access to adjacent properties during construction. The right-of-way maps will detail the additional right-of-way required for the project.
When completed, Valencia College Lane will be widened from an existing two-lane roadway to a four-lane divided roadway. The improvement includes on-road bicycle lanes, sidewalks, landscaping and street lighting. A portion of Goldenrod Road will also be reconstructed north and south of Valencia College Lane to improve intersection operations.
The existing drainage ditches along the project will be replaced with an underground, enclosed drainage system and retention ponds will be constructed to treat the stormwater.
Valencia College Lane is located within the jurisdiction of the St. Johns River Water Management District (SJRWMD). The construction of the stormwater ponds will require permitting through the SJRWMD, Army Corps of Engineers and must also comply with Orange County requirements. The permit requirements will address the design and construction of the roadway and ponds. |