Reams Road

Taborfield Avenue to Delmar Avenue

Description

Reams Road will be widened from two to four lanes from Taborfield Avenue to Delmar Avenue for a length of 0.6 miles.

Improvement features examined were:

  • Four-lane widening
  • Drainage system
  • Landscaping
  • Pedestrian and bicycle facilities

The improvements will include:

  • 11-foot-wide travel lanes
  • A 15-foot, raised, grassed median
  • Concrete sidewalks
  • Multipurpose path
  • Landscaping
  • Curb and gutter inlets for drainage
  • Roadway lighting

The stormwater runoff from the roadway will be collected by an enclosed drainage system through a system of pipes to an existing stormwater retention pond.

Purpose

Purpose The project will increase capacity; Reams Road is currently a two-lane facility with housing and commercial development currently flourishing in the surrounding areas.

Status

Construction to begin Spring 2017.

Public Involvement

An informational newsletter will be distributed to the residents of the project area in the near future.

Contact Us

Orange County Public Works
4200 S. John Young Pkwy.
Orlando, FL. 32839

Phone: (407) 836-8070
Fax: (407) 836-8079