Skip to main content
Accessibility Help
Orange County Government, Florida
Browse Services

All American Boulevard

A one mile corridor from Clarcona-Ocoee Road
to Kennedy Boulevard

Description

The All-American Boulevard project limits range from the intersection of Edgewater Drive and Clarcona-Ocoee Road to approximately 500 feet west of the intersection of Forest City Road (SR 434) and Kennedy Boulevard.

The project will consist of the construction of a new 4-lane roadway. Pedestrian safety will also be improved with the addition of sidewalks and bike lanes. Roadway lighting and median landscaping will also be included.

In addition, the existing All-American Boulevard, which will be renamed to Old All-American Boulevard, will be realigned so that it forms a “T” intersection with the new All-American Boulevard.

Purpose

All-American Boulevard is being constructed to provide a direct connection between Clarcona-Ocoee Road, Forest City Road and Kennedy Boulevard. The new roadway will eliminate the unsafe curve of the existing All-American Boulevard and will serve to alleviate congestion.

Status

The design was completed in March, 2011 but was not funded for right-of-way acquisition or construction.

The construction plans currently are being updated to meet current design standards and right-of-way acquisition is ongoing.

Public Involvement


Map


Contact Us

Jeffrey Sloman, P.E.
Orange County Public Works
4200 S. John Young Parkway
Orlando FL 32802-1393

Phone: (407) 836-7908
Fax: (407) 836-8024
Email: Jeffrey.Sloman@ocfl.net